濟(jì)南電纜橋架安裝施工要求及規(guī)范

  電纜橋架在我國(guó)的應(yīng)用只有十多年,在歐美發(fā)達(dá)也不過是幾十年。在一個(gè)機(jī)房項(xiàng)目中,比起造價(jià)昂貴、高科技的硬件和軟件,橋架顯的很不起眼,也很少為人關(guān)注,但它卻也是整個(gè)布線工程中不可缺少的部分。那么在施工中電纜橋架安裝施工要求及規(guī)范怎么樣?

  The application of cable trays in China has only been more than ten years, and in developed countries in Europe and America, it is only a few decades. In a computer room project, compared to expensive and high-tech hardware and software, cable trays may appear inconspicuous and receive little attention, but they are still an indispensable part of the entire cabling project. So what are the requirements and standards for the installation of cable trays during construction?base64_image

  1 一般規(guī)定  1.1本章適用于電壓為10KV及以下新建擴(kuò)建的一般工業(yè)與民用建筑電纜、橋架安裝和橋架內(nèi)電纜敷設(shè)

  1 General Provisions 1.1 This chapter applies to the installation of cables, cable trays, and cable laying inside cable trays for newly constructed and expanded general industrial and civil buildings with a voltage of 10KV or below

  1.2電纜橋架安裝和橋架內(nèi)電纜敷設(shè),應(yīng)按已批準(zhǔn)的設(shè)計(jì)文件施工。

  1.2 The installation of cable trays and the laying of cables inside the trays shall be carried out in accordance with the approved design documents.

  1.3由支、吊、托架支撐的托盤(槽)或梯架直線段、彎通非直線段組合而成,敷設(shè)電纜具有連續(xù)性的剛性結(jié)構(gòu)系統(tǒng),為電纜橋架。見圖1.3

  1.3 A rigid structural system consisting of trays (troughs) or ladder straight sections and curved non straight sections supported by supports, hangers, and brackets, with continuous cable laying, is called a cable tray. Refer to Figure 1.3

  1.4 金屬電纜橋架及其支架和引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)定:

  1.4 Metal cable trays and their supports, as well as metal cable conduits introduced or led out, must be reliably grounded (PE) or grounded (PEN), and must comply with the following regulations:

  1.4.1金屬電纜橋架及支架全長(zhǎng)應(yīng)不少于2處與接地(PE)或接零(PEN)干線相連接;

  1.4.1 The total length of metal cable trays and supports should be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points;

  1.4.2非鍍鋅電纜橋架間連接板的兩端跨接線銅芯接地線,接地線小允許截面積不小于4mm2;

  1.4.2 Copper core grounding wire for the two ends of the connecting plate between non galvanized cable trays, with a minimum allowable cross-sectional area of not less than 4mm2 for the grounding wire;

  1.4.3鍍鋅電纜橋架間連接板的兩端不跨接接地線,但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  1.4.3 The two ends of the connecting plate between galvanized cable trays shall not be connected to the grounding wire, but there shall be no less than 2 connection fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  1.4.5電纜敷設(shè)嚴(yán)禁有絞擰、鎧裝壓扁、護(hù)層斷裂和表面嚴(yán)重劃傷等缺陷。

  1.4.5 Cable laying must strictly prohibit defects such as twisting, flattening of armor, breakage of protective layer, and severe surface scratches.

  1.4.6電纜橋架處如有防火要求的場(chǎng)所,應(yīng)采取防火隔離措施。

  If there are fire prevention requirements at the cable tray location, fire isolation measures should be taken.

  2 施工準(zhǔn)備

  2. Construction preparation

  2.1 技術(shù)準(zhǔn)備:

  2.1 Technical Preparation:

  2.1.1按照已批準(zhǔn)的施工組織設(shè)計(jì)(施工方案)進(jìn)行技術(shù)、交底。

  2.1.1 Conduct technical and safety briefings in accordance with the approved construction organization design (construction plan).

  2.1.2 施工執(zhí)行工藝標(biāo)準(zhǔn)、圖集、規(guī)范齊全。

  2.1.2 The construction execution process standards, drawings, and specifications are complete.

  2.1.3電纜橋架敷設(shè)前,應(yīng)檢查橋架敷設(shè)有無與其他設(shè)備、管線交叉或重疊無法施工的地方,施工前應(yīng)與各工種、監(jiān)理或建設(shè)單位及設(shè)計(jì)單位協(xié)商好,并作好記錄,以保證施工順利進(jìn)行。

  Before laying cable trays, it is necessary to check whether there are any areas where the tray crosses or overlaps with other equipment or pipelines that cannot be constructed. Prior to construction, it is necessary to consult with various trades, supervisors, construction units, and design units, and make records to ensure smooth construction.

  2.1.4根據(jù)施工圖或施工所用電纜應(yīng)作好電纜牽引力的計(jì)算。

  2.1.4 According to the construction drawings or the cables used for construction, the calculation of cable traction force should be carried out.

  1.電纜橋架規(guī)格及型號(hào)必須符合設(shè)計(jì)要求,附件齊全;橋架與配件、附件和緊固件各種型鋼均應(yīng)采用鍍鋅標(biāo)準(zhǔn)件。

  1. The specifications and models of cable trays must meet the design requirements, and all accessories must be complete; All types of steel for cable trays, accessories, attachments, and fasteners should use galvanized standard parts.

  2.各種規(guī)格電纜橋架的直線段、彎通、橋架附件及支、吊架立柱及型鋼等有產(chǎn)品合格證,橋架內(nèi)外應(yīng)光滑平整,無棱刺,不應(yīng)有扭曲翹邊等變形現(xiàn)象。

  2. The straight sections, bends, accessories, supports, hangers, columns, and steel sections of various specifications of cable trays should have product certification. The inside and outside of the tray should be smooth and flat, without edges or burrs, and there should be no distortion or warping.

  3.橋架訂貨或制作應(yīng)按設(shè)計(jì)要求進(jìn)行,不應(yīng)有誤,應(yīng)反復(fù)校核以免造成浪費(fèi)。

  3. The ordering or production of cable trays should be carried out according to the design requirements, without errors, and should be repeatedly checked to avoid waste.

  4.橋架安裝選擇需屏蔽電氣干擾的電纜回路,有腐蝕的場(chǎng)所、易燃粉塵場(chǎng)所,應(yīng)選用無蓋無孔封閉型托盤,當(dāng)需要因地制宜的場(chǎng)所,宜選用組裝式托盤或有孔托盤及梯架;在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所,宜帶有蓋板。低壓電力電纜與控制電纜共用同一托盤或梯架時(shí),應(yīng)選用中間有隔板的托盤或梯架;在托盤、梯架分支、引上、引下處應(yīng)設(shè)適當(dāng)?shù)膹澩?;因受空間條件限制不便裝設(shè)彎通或有特殊要求時(shí),可選用軟連接板,鉸接板;伸縮縫應(yīng)設(shè)置伸縮板;連接兩段不同寬度或高度的托盤、梯架可配置變寬或變高板。但在施工中,支、吊架和橋架的選擇應(yīng)依設(shè)計(jì)或工程布置條件選擇。

  4. When installing cable trays, cable circuits that need to be shielded from electrical interference should be selected. In places with corrosion and flammable dust, uncovered and non perforated enclosed trays should be used. When suitable for local conditions, assembled trays or perforated trays and ladders should be selected; In environments or outdoor places that are prone to dust accumulation and require cover, it is advisable to have a cover plate. When low-voltage power cables and control cables share the same tray or ladder, a tray or ladder with a partition in the middle should be selected; Appropriate bends should be installed at the branching, leading up, and leading down points of pallets and ladders; When it is not convenient to install bends due to space constraints or there are special requirements, soft connecting plates and hinged plates can be used; Expansion joints should be equipped with expansion plates; Connecting two trays or ladders of different widths or heights can be configured with variable width or height boards. However, during construction, the selection of supports, hangers, and cable trays should be based on the design or engineering layout conditions.

  5.托盤、梯架的寬和高度,應(yīng)按下列要求選擇:

  5. The width and height of pallets and ladders should be selected according to the following requirements:

  (1)電纜在橋架內(nèi)的填充率,電力電纜不應(yīng)大于40%;控制電纜不應(yīng)大于50%。并應(yīng)留有一定的備用空位,以便今后為增添電纜用;

  (1) The filling rate of cables in cable trays should not exceed 40% for power cables; The control cable should not exceed 50%. And there should be some spare space left for future cable additions;

  (2)所選托盤、橋架規(guī)格的承載能力應(yīng)滿足規(guī)定。其工作均布荷載不應(yīng)大于所選托盤、梯架荷載等級(jí)的額定均布荷載;

  (2) The bearing capacity of the selected tray and bridge specifications should meet the requirements. The uniformly distributed load of its work should not exceed the rated uniformly distributed load of the selected pallet and ladder load level;

  (3)工作均布荷載下的相對(duì)撓度不宜大于1/200。

  (3) The relative deflection under uniformly distributed load should not exceed 1/200.

  托盤、梯架直線段,可按單件標(biāo)準(zhǔn)長(zhǎng)度選擇。單件標(biāo)準(zhǔn)長(zhǎng)度一般規(guī)定為2、3、4、6m。托盤、梯架的寬度與高度常用規(guī)格尺寸系列如表2.4-1

  Tray and ladder straight sections can be selected according to the standard length of a single piece. The standard length of a single piece is generally specified as 2, 3, 4, and 6 meters. The commonly used specifications and dimension series for the width and height of pallets and ladders are shown in Table 2.4-1

  注:符號(hào)△表示常用規(guī)格。

  Note: The symbol △ represents commonly used specifications.

  各類彎通及附件規(guī)格,應(yīng)適合工程布置條件,并與托盤、梯架配套。

  All types of bends and accessory specifications should be suitable for the engineering layout conditions and matched with pallets and ladders.

  支、吊架規(guī)格選擇,應(yīng)按托盤、梯架規(guī)格層數(shù)、跨距等條件配置,并應(yīng)滿足荷載的要求。

  The selection of support and hanger specifications should be based on the number of layers, span, and other conditions of the pallet and ladder, and should meet the requirements of the load.

  鋼制橋架的表面處理方式,應(yīng)按工程環(huán)境條件、重要性、耐久性和技術(shù)經(jīng)濟(jì)性等因素進(jìn)行選擇。一般情況宜按表2.4-2選擇適用工程環(huán)境條件的防腐處理方式。當(dāng)采用表中“T”類防腐方式為鍍鋅鎳合金、高純化等其它防腐處理的橋架,應(yīng)按規(guī)定試驗(yàn)驗(yàn)證,并應(yīng)具有明確的技術(shù)質(zhì)量指標(biāo)及檢測(cè)方式。

  The surface treatment method for steel cable trays should be selected based on factors such as engineering environmental conditions, importance, durability, and technical economy. Generally, it is advisable to choose the anti-corrosion treatment method that is suitable for the engineering environmental conditions according to Table 2.4-2. When using the "T" anti-corrosion method in the table, such as galvanized nickel alloy, high-purity or other anti-corrosion treatments, the bridge should be tested and verified according to regulations, and should have clear technical quality indicators and testing methods.

  注:符號(hào)“○”表示防腐類別。

  Note: The symbol "○" indicates the recommended anti-corrosion category.

  6.橋架的外觀檢查

  6. Appearance inspection of bridge frame

  橋架產(chǎn)品包裝箱內(nèi)應(yīng)有裝箱清單、產(chǎn)品合格證及出廠檢驗(yàn)報(bào)告。托盤、梯架板材厚度應(yīng)滿足表2.6的規(guī)定。表面防腐層材料應(yīng)符合現(xiàn)行有關(guān)標(biāo)準(zhǔn)的規(guī)定。

  The packaging box for bridge products should include a packing list, product certification, and factory inspection report. The thickness of pallets and ladder boards should meet the requirements of Table 2.6. The surface anti-corrosion coating material should comply with the relevant national standards currently in effect.

  熱浸鍍鋅的托盤、橋架鍍層表面應(yīng)均勻,無毛刺、過燒、掛灰、傷痕、局部未鍍鋅(直徑2mm以上)等缺陷,不得有影響安裝的鋅瘤。螺紋的鍍層應(yīng)光滑,螺栓連接件應(yīng)能擰入。

  The surface of hot-dip galvanized trays and cable trays should be uniform, without defects such as burrs, overburning, hanging dust, scars, and partial non galvanizing (diameter of 2mm or more), and there should be no zinc nodules that affect installation. The coating of the thread should be smooth, and the bolt connection should be able to be screwed in.

  電鍍鋅的鋅層表面應(yīng)光滑均勻,致密。不得有起皮、氣泡、花斑、局部未鍍、劃傷等缺陷。

  The surface of the zinc layer of electroplated zinc should be smooth, uniform, and dense. There shall be no defects such as peeling, bubbles, flower spots, partial uncoated areas, scratches, etc.

  噴涂應(yīng)平整、光滑、均勻、不起皮、無氣泡水泡。

  The spraying should be smooth, even, without peeling or bubbles.

  橋架焊縫表面均勻,不得有漏焊、裂紋、夾渣、燒穿、弧坑等缺陷。

  The surface of the bridge welding seam should be uniform and free of defects such as missed welding, cracks, slag inclusion, burn through, arc craters, etc.

  橋架螺栓孔徑,在螺桿直徑不大于M16時(shí),可比螺桿直徑大2mm。

  The hole diameter of the bridge bolt can be 2mm larger than the screw diameter when the screw diameter is not greater than M16.

  螺栓連接孔的孔距允許偏差:同一組內(nèi)相鄰兩孔間距±0.7mm,同一組內(nèi)任意兩孔間距±1mm;相鄰兩組的端孔間距±1.2mm。

  The allowable deviation for the distance between bolt connection holes is: the distance between adjacent holes in the same group is ± 0.7mm, the distance between any two holes in the same group is ± 1mm, and the distance between end holes in adjacent groups is ± 1.2mm.

  7.膨脹螺栓:應(yīng)根據(jù)允許拉力和剪力進(jìn)行選擇;可按計(jì)劃驗(yàn)收,絲扣應(yīng)完好無損。

  7. Expansion bolts: should be selected based on allowable tensile and shear forces; The inspection can be carried out according to the plan, and the thread should be intact and undamaged.

  8.電纜應(yīng)有合格證和“CCC”認(rèn)證標(biāo)志,并應(yīng)有“CCC”認(rèn)證復(fù)印件;每盤電纜上應(yīng)標(biāo)明規(guī)格、型號(hào)、電壓等級(jí)、長(zhǎng)度及出廠日期電纜相應(yīng)完好無損。

  8. The cable should have a certificate of conformity and the "CCC" certification mark, and should have a copy of the "CCC" certification; Each cable reel should indicate the specifications, model, voltage level, length, and date of manufacture, and the cable should be intact and undamaged accordingly.

  9.電纜外觀完好無損,鎧裝無銹蝕、無機(jī)械操作,無皺折和扭曲現(xiàn)象。油浸電纜應(yīng)密封良好,無漏油及滲油現(xiàn)象。橡套及塑料電纜外皮及絕緣層無老化及裂紋。電纜端頭密封良好。

  9. The appearance of the cable is intact and undamaged, the armor is not corroded, there is no mechanical operation, and there is no wrinkling or twisting phenomenon. Oil immersed cables should be well sealed without oil leakage or seepage. The rubber sleeve and plastic cable sheath and insulation layer have no aging or cracks. The cable end is well sealed.

  10.其它附屬材料;電纜標(biāo)示牌、油漆、汽油、封鉛、硬脂酸白布帶、橡皮包布、黑包布、塑料絕緣帶等均應(yīng)符合要求

  10. Other ancillary materials; Cable signs, paint, gasoline, lead sealing, stearic acid white cloth tape, rubber wrap, black wrap, plastic insulation tape, etc. should all meet the requirements

  3 施工工藝

  3 Construction Techniques

  3.1 電纜橋架安裝施工工藝

  3.1 Construction process for cable tray installation

  3.1.1電纜橋架安裝工藝流程:

  3.1.1 Cable tray installation process:

  定位放線→預(yù)埋鐵件或膨脹螺栓→支、吊、托架安裝→橋架安裝→保護(hù)接地安裝

  Positioning and laying out → Pre embedded iron parts or expansion bolts → Installation of supports, hangers, and brackets → Installation of cable trays → Installation of protective grounding

  3.1.2根據(jù)施工圖確定始端到終端位置,沿圖紙標(biāo)定走向,找好水平、垂直、彎通,用粉線袋或畫線沿橋架走向在墻壁、頂棚、地面、梁、板、柱等處彈線或畫線,并均勻檔距畫出支、吊、托架位置。

  3.1.2 Determine the starting and ending positions according to the construction drawing, mark the direction along the drawing, find the horizontal, vertical, and curved lines, use a powder line bag or draw lines along the bridge direction to snap or draw lines on walls, ceilings, floors, beams, slabs, columns, etc., and draw the positions of supports, hangers, and brackets evenly spaced.

  3.1.3預(yù)埋鐵件或膨脹螺栓

  3.1.3 Pre embedded iron parts or expansion bolts

  (1) 預(yù)埋鐵件的自制加工不應(yīng)小于120mm×80mm×6mm,做法如本標(biāo)準(zhǔn)6.3.7.2圖6.3.7.2。其錨固圓鋼的直徑不小于10mm。

  (1) The self-made processing of embedded iron parts should not be less than 120mm × 80mm × 6mm, as shown in Figure 6.3.7.2 of this standard. The diameter of the anchored round steel shall not be less than 10mm.

  (2) 緊密配合土建結(jié)構(gòu)的施工,將預(yù)埋鐵件平面緊貼模板,將錨固圓鋼用綁扎或焊接的方法固定在結(jié)構(gòu)內(nèi)的鋼筋上;待混凝土模板拆除后,預(yù)埋鐵件平面外露,將支架、吊架或托架焊接在上面進(jìn)行固定。

  (2) Closely cooperate with the construction of civil engineering structures, tightly adhere the embedded iron parts to the formwork, and fix the anchoring round steel to the steel bars inside the structure by binding or welding; After the concrete formwork is removed, the embedded iron parts should be exposed on the surface, and the brackets, hangers or brackets should be welded on top for fixation.

  (3) 根據(jù)支架承受的荷重,選擇相應(yīng)的膨脹螺栓及鉆頭;埋好螺栓后,可用螺母配上相應(yīng)的墊圈將支架或吊架直接固定在金屬膨脹螺栓上,可參見本標(biāo)準(zhǔn)6.3.7.7圖表。

  (3) Select the corresponding expansion bolts and drill bits based on the load borne by the bracket; After burying the bolts, the bracket or hanger can be directly fixed to the metal expansion bolt with nuts and corresponding washers, as shown in Figure 6.3.7.7 of this standard.

  4.支、吊架安裝

  4. Installation of supports and hangers

  (1) 支架與吊架所用鋼材應(yīng)平直,無顯著扭曲。下料后長(zhǎng)短偏差應(yīng)在3mm范圍內(nèi),切口處應(yīng)無卷邊、毛刺;

  (1) The steel used for brackets and hangers should be straight and free from significant distortion. The length deviation after cutting should be within 3mm, and there should be no curled edges or burrs at the incision;

  (2) 鋼支架與吊架應(yīng)焊接牢固,無顯著變形,焊接前厚度超過4mm的支架、鐵件應(yīng)打坡口,焊縫均勻平整,焊縫長(zhǎng)度應(yīng)符合要求,不得出現(xiàn)裂紋、咬邊、氣孔、凹陷、漏焊等缺陷;

  (2) Steel brackets and hangers should be welded firmly without significant deformation. Brackets and iron parts with a thickness exceeding 4mm before welding should be chamfered, and the weld seam should be uniform and smooth. The weld seam length should meet the requirements and should not have defects such as cracks, undercutting, porosity, indentation, or missed welding;

  (3)支架與吊架應(yīng)安裝牢固,保證橫平豎直,在有坡度的建筑物上安裝支架與吊架應(yīng)與建筑物的坡度、角度一致;

  (3) The brackets and hangers should be installed firmly, ensuring horizontal and vertical alignment. When installing brackets and hangers on buildings with slopes, they should be consistent with the slope and angle of the building;

  支架與吊架的規(guī)格一般不應(yīng)小于扁鋼30mm×3mm;角鋼25mm×25mm×3mm;

  The specifications of brackets and hangers should generally not be less than 30mm × 3mm for flat steel and 25mm × 25mm × 3mm for angle steel;

 ?。?)嚴(yán)禁用電氣焊切割鋼結(jié)構(gòu)或輕鋼龍骨任何部位;

  (5) It is strictly prohibited to use electrical welding to cut any part of steel structures or light steel joists;

 ?。?)吊具應(yīng)采用定型產(chǎn)品,并應(yīng)有各自獨(dú)立的吊裝卡具或支撐系統(tǒng)。

  (6) Universal lifting devices should use standardized products and have their own independent lifting fixtures or support systems.

 ?。?)固定支點(diǎn)間距一般不應(yīng)大于1.5~2m。在進(jìn)出接線盒、箱、柜、轉(zhuǎn)角、轉(zhuǎn)彎和變形縫兩端及丁字接頭的三端500mm以內(nèi)應(yīng)設(shè)固定支持點(diǎn)。

  (7) The distance between fixed support points should generally not exceed 1.5-2m. Fixed support points should be set within 500mm at both ends of the entrance and exit junction boxes, boxes, cabinets, corners, bends, and deformation joints, as well as at the three ends of the T-shaped joint.

  (8)嚴(yán)禁用木磚固定支架與吊架。

  (8) It is strictly prohibited to use wooden bricks to fix brackets and hangers.

  5.橋架安裝

  5. Bridge installation

  (1) 電纜橋架水平敷設(shè)時(shí),支撐跨距一般為1.5~3m,電纜橋架垂直敷設(shè)時(shí)固定點(diǎn)間距不宜大于2m。橋架彎通彎曲半徑不大于300mm時(shí),應(yīng)在距彎曲段與直線段結(jié)合處300~600mm的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)彎曲半徑大于300mm時(shí),還應(yīng)在彎通中部增設(shè)一個(gè)支、吊架。支、吊架和橋架安裝必須考慮電纜敷設(shè)彎曲半徑滿足規(guī)范小彎曲半徑。見表3.1.5。

  (1) When laying cable trays horizontally, the support span is generally 1.5-3m. When laying cable trays vertically, the spacing between fixed points should not exceed 2m. When the bending radius of the tray is not greater than 300mm, a support or hanger should be set on the side of the straight section 300-600mm away from the junction of the curved section and the straight section. When the bending radius is greater than 300mm, a support or hanger should be added in the middle of the bend. The installation of supports, hangers, and cable trays must consider that the bending radius of cable laying meets the minimum bending radius specified in the specifications. See Table 3.1.5.

  注為電纜外徑。

  Note the outer diameter of the cable.

  (2)門型角鋼支架的安裝:梯型橋架沿墻垂直敷設(shè),可使用門型角鋼支架,支架的固定應(yīng)盡可能配合土建施工預(yù)埋。如圖3.1.5(2-1),也可在土建施工中預(yù)埋開角螺栓,用開角螺栓固定支架如圖3.1.5(2-1),也可以采用膨脹螺栓固定。

  (2) Installation of door type angle steel bracket: The ladder type bridge is vertically laid along the wall, and door type angle steel bracket can be used. The fixation of the bracket should be embedded as much as possible in conjunction with civil construction. As shown in Figure 3.1.5 (2-1), angle bolts can also be pre embedded in civil construction to fix the bracket as shown in Figure 3.1.5 (2-1), or expansion bolts can be used for fixation.

  (3)梯型角鋼支架的安裝:橋架沿墻、柱水平安裝時(shí),托壁需安裝在異型鋼立柱上,而立柱要安裝在梯型角鋼支架上,使柱和墻上的橋架固定支架(或托臂)在同一條直線上。制作見圖和表3.1.5(3)底架與門型架焊接時(shí),焊角高度5mm。

  (3) Installation of ladder type angle steel bracket: When the bridge is installed horizontally along the wall or column, the support wall needs to be installed on the special-shaped steel column, and the column needs to be installed on the ladder type angle steel bracket, so that the fixed bracket (or support arm) of the column and the bridge on the wall are in the same straight line. When welding the chassis and door frame as shown in Figure 3.1.5 (3), the welding angle height should be 5mm.

  (4)電纜橋架立柱側(cè)壁式安裝:立柱是直接支承托臂的部件,分工字鋼槽鋼、角鋼、異型鋼立柱;立柱可以在墻上、柱上安裝、也可懸吊在梁板上安裝。做法在混凝土可預(yù)埋鐵件;砌體可砌筑預(yù)制砌塊;也可以采用膨脹螺栓但必須在混凝土強(qiáng)度C20或磚強(qiáng)度在MU10以上的磚砌體上,作法可參照3.1.5(4a、b、c、d、e、f)。

  (4) Side wall installation of cable tray columns: The columns are components that directly support the support arms, and are divided into steel channel steel, angle steel, and special-shaped steel columns; Columns can be installed on walls, columns, or suspended from beams and slabs. The method involves embedding iron components in concrete; Prefabricated masonry blocks can be used for masonry construction; Expansion bolts can also be used, but they must be used on brick masonry with concrete strength C20 or brick strength above MU10. The method can refer to section 3.1.5 (4a, b, c, d, e, f).

  (5)電纜橋架應(yīng)敷設(shè)在易燃易爆氣體管和熱力管道的下方,當(dāng)設(shè)計(jì)無要求時(shí),與管道的小凈距,符合3.1.5(5)的規(guī)定。

  (5) Cable trays should be laid below flammable and explosive gas pipelines and thermal pipelines. When there are no design requirements, the minimum clear distance from the pipeline should comply with the provisions of 3.1.5 (5).

  6 托臂安裝:

  Installation of Arm 6:

  托臂是直接支承托盤、梯架單獨(dú)固定的剛性部件,托臂有螺栓固定可預(yù)埋螺栓,也可采用膨脹螺栓,也可卡接,如圖3.1.6(1)、(2)、(3)、(4)、(5)。

  The support arm is a rigid component that directly supports the tray and ladder frame and is fixed separately. The support arm can be fixed with bolts that can be embedded, expansion bolts, or clamped, as shown in Figure 3.1.6 (1), (2), (3), (4), and (5).

  3.2 橋架安裝

  3.2 Bridge installation

  1.直線段鋼制電纜橋架長(zhǎng)度超過30m,鋁合金或玻璃鋼制電纜橋架長(zhǎng)度超過15m應(yīng)設(shè)有伸縮節(jié),跨越伸縮縫處設(shè)置補(bǔ)償裝置,可用帶伸縮節(jié)的橋架。

  1. If the length of a straight steel cable tray exceeds 30m, or if the length of an aluminum alloy or fiberglass cable tray exceeds 15m, expansion joints should be installed. Compensation devices should be installed at the expansion joint crossing points, and cable trays with expansion joints can be used.

  2.橋架與支架間螺栓、橋架連接板螺栓緊固無遺漏,螺母位于橋架外側(cè),當(dāng)鋁合金橋架與鋼支架固定時(shí),有相互間絕緣防電化措施腐蝕措施,一般可墊石棉墊。

  2. The bolts between the bridge and the bracket, as well as the bolts of the bridge connecting plate, are tightened without omission, and the nuts are located on the outside of the bridge. When the aluminum alloy bridge and the steel bracket are fixed, there are mutual insulation and corrosion prevention measures, and asbestos pads can generally be used.

  3.敷設(shè)在豎井內(nèi)和穿越不同防火區(qū)的橋架,應(yīng)按設(shè)計(jì)要求位置,有防火隔離措施,電纜橋架在電氣豎井內(nèi)敷設(shè)可采用角鋼固定,見圖3.1.8。

  3. Cable trays laid in vertical shafts and crossing different fire zones should be located according to design requirements and have fire isolation measures. Cable trays laid in electrical vertical shafts can be fixed with angle steel, as shown in Figure 3.1.8.

  4.電纜橋架在穿過防火墻及防火樓板時(shí),應(yīng)采取防火隔離措施,防止火災(zāi)沿線路延燃;防火隔離墻、板,應(yīng)配合土建施工預(yù)留洞口,在洞口處預(yù)埋好護(hù)邊角鋼,施工時(shí)根據(jù)電纜敷設(shè)的層數(shù)和根數(shù)用L50×50×5角鋼作固定框,同時(shí)將固定柜焊在護(hù)邊角鋼上;也可以先作好框在土建施工中砌體或澆灌混凝土?xí)r安裝在墻、板中。

  4. When cable trays pass through firewalls and fire-resistant floor slabs, fire-resistant isolation measures should be taken to prevent fires from spreading along the line; Fire isolation walls and panels should be equipped with reserved openings for civil construction, and edge protection angle steel should be pre embedded at the openings. During construction, L50 × 50 × 5 angle steel should be used as a fixed frame according to the number of layers and cables laid, and the fixed cabinet should be welded to the edge protection angle steel; Alternatively, the frame can be installed in the wall or slab during masonry or concrete pouring in civil construction.

  3.3 橋架的接地,當(dāng)設(shè)計(jì)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí),應(yīng)符合下列要求:

  3.3 When the design allows the use of the bridge system to form a grounding main circuit, the grounding of the bridge should meet the following requirements:

  1. 金屬電纜橋架及其支架引入或引出的金屬電纜導(dǎo)管必須接地(PE)或接零(PEN)可靠,且必須符合下列規(guī)范:

  1. Metal cable trays and their brackets must have reliable grounding (PE) or neutral (PEN) for the metal cable conduits introduced or led out, and must comply with the following specifications:

  (1) 金屬電纜橋架及其支架全長(zhǎng),與接地(PE)或接零(PEN)干線相連接不小于2處,使整個(gè)橋架為一個(gè)電氣通路。

  (1) The entire length of the metal cable tray and its support shall be connected to the grounding (PE) or neutral (PEN) main line at no less than 2 points, making the entire tray an electrical pathway.

  (2) 非鍍鋅電纜橋架間連接的兩端跨接銅芯接地線,接地線小允許截面積不小于4mm2。

  (2) The two ends of the non galvanized cable tray are connected with copper core grounding wires, and the minimum allowable cross-sectional area of the grounding wire is not less than 4mm2.

  (3) 鍍鋅電纜橋架間連接板的兩端可不跨接接地線,但連接板兩端不少于2個(gè)有防松螺帽或防松墊圈的連接固定螺栓。

  (3) The two ends of the connecting plate between galvanized cable trays may not be connected to the grounding wire, but there shall be no less than 2 fixing bolts with anti loosening nuts or anti loosening washers at both ends of the connecting plate.

  2. 盤、梯架端部之間連接電阻不應(yīng)大于0.00033Ω并應(yīng)用等電位聯(lián)結(jié)測(cè)試儀(導(dǎo)通儀)或微Ω表測(cè)試,測(cè)試應(yīng)在連接點(diǎn)的兩側(cè)進(jìn)行,對(duì)整個(gè)橋架全長(zhǎng)的兩端連接電阻不應(yīng)大于0.5Ω或由設(shè)計(jì)決定,否則應(yīng)增加接地點(diǎn),以滿足要求。接地孔應(yīng)涂層,與涂層接觸的螺栓有一側(cè)的平墊應(yīng)使用帶爪的專用接地墊圈。

  2. The connection resistance between the ends of the tray and ladder should not exceed 0.00033 Ω and should be tested using an equipotential bonding tester (continuity meter) or a micro Ω meter. The test should be conducted on both sides of the connection point, and the connection resistance at both ends of the entire length of the bridge should not exceed 0.5 Ω or be determined by the design. Otherwise, a grounding point should be added to meet the requirements. The grounding hole should eliminate the coating, and the flat pad on one side of the bolt in contact with the coating should use a special grounding washer with claws.

  3. 伸縮縫或軟連接處需采用編織銅線連接。沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)托盤、梯架應(yīng)小有一點(diǎn)與接地干線可靠連接;在接地部位的連接處應(yīng)裝置彈簧墊圈,以免松動(dòng)。

  3. Expansion joints or soft connections should be connected using braided copper wires. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the tray and ladder should be reliably connected to the grounding main line at a small point; A spring washer should be installed at the connection point of the grounding part to prevent loosening.

  電纜橋架作為布線工程的一個(gè)配套項(xiàng)目,目前尚無專門的規(guī)范指導(dǎo),個(gè)生產(chǎn)廠家的規(guī)格程式缺乏通用性,因此,設(shè)計(jì)選型過程應(yīng)根據(jù)弱電各個(gè)系統(tǒng)纜顯得類型、數(shù)量,合理選定適用的橋架。(1)確定方向: 根據(jù)建筑平面布置圖,結(jié)合空調(diào)管線和電氣管線等設(shè)置情況、方便維修,以及電纜路由的疏密來確定電纜橋架的路由。在室內(nèi),盡可能沿建筑物的墻、柱、梁及樓板架設(shè),如許利用綜合管廊架設(shè)時(shí),則應(yīng)在管道一側(cè)或上方平行架設(shè),并考慮引下線和分支線盡量避免交叉,如無其它管架借用,則需自設(shè)立(支)柱。

  As a supporting project of wiring engineering, there is currently no specialized specification guidance for cable trays, and the specifications and programs of individual manufacturers lack universality. Therefore, the design and selection process should be based on the type and quantity of cables in various weak current systems, and the appropriate cable tray should be selected reasonably. (1) Determine direction: Determine the optimal route for cable trays based on the building layout plan, combined with the installation of air conditioning and electrical pipelines, convenient maintenance, and the density of cable routing. Indoors, try to install along the walls, columns, beams, and floor slabs of the building as much as possible. When using a comprehensive pipe gallery for installation, parallel installation should be carried out on one side or above the pipeline, and consideration should be given to avoiding crossing of down conductors and branch lines as much as possible. If there are no other pipe racks to borrow, self installing (supporting) columns is required.

  (2)荷載計(jì)算:計(jì)算電纜橋架主干線縱斷面上單位長(zhǎng)度的電纜重量。

  (2) Load calculation: Calculate the weight of cables per unit length on the longitudinal section of the main cable tray.

  (3)確定橋架的寬度:根據(jù)布放電纜條數(shù)、電纜直徑及電纜的間距來確定電纜橋架的型號(hào)、規(guī)格, 托臂的長(zhǎng)度,支柱的長(zhǎng)度、間距,橋架的寬度和層數(shù)。

  (3) Determine the width of the cable tray: Determine the model and specifications of the cable tray, the length of the support arm, the length and spacing of the pillars, the width and number of layers of the cable tray based on the number of cables laid, the diameter of the cables, and the spacing between the cables.

  (4)確定安裝方式:根據(jù)場(chǎng)所的設(shè)置條件確定橋架的固定方式,選擇懸吊式、直立式、側(cè)壁式或是混合式,連接件和緊固件一般是配套供應(yīng)的,此外,根據(jù)橋架結(jié)構(gòu)選折相應(yīng)的蓋板。

  (4) Determine installation method: Determine the fixing method of the bridge according to the setting conditions of the site, choose suspended, upright, side wall or hybrid, and the connectors and fasteners are generally supplied together. In addition, select the corresponding cover plate according to the structure of the bridge.

  (5)繪出電纜橋架平、剖面圖,局部部位還應(yīng)繪出空間圖,開列材料表。

  (5) Draw a plan and section diagram of the cable tray, and also draw a spatial diagram of some parts, and list the material list.

  2、如與電力電纜橋架合用時(shí),應(yīng)將電力電纜和弱電電纜各直一側(cè),中間采用隔板分隔。

  2. When used in conjunction with power cable trays, the power cables and weak current cables should be placed on one side each, and separated by a partition in the middle.

  3、弱電電纜與其它低電壓電纜合用橋架時(shí),應(yīng)嚴(yán)格執(zhí)行選擇具有外屏蔽層的弱電系統(tǒng)的弱電電纜,避免相互間的干擾。

  3. When weak current cables are used in cable trays with other low voltage cables, it is necessary to strictly select weak current cables with external shielding layers to avoid interference between them.

  4、電纜橋架安裝要求

  4. Installation requirements for cable trays

  (1)槽式大跨距電纜橋架由室外進(jìn)入建筑物內(nèi)時(shí),橋架向外的坡度不得小于1/100。(2)電纜橋架與用電設(shè)備交越時(shí),其間的凈距不小于0.5m。

  (1) When the trough type large-span cable tray enters the building from the outside, the outward slope of the tray shall not be less than 1/100. (2) When the cable tray intersects with electrical equipment, the clear distance between them shall not be less than 0.5m.

  (3)兩組電纜橋架在同一高度平行敷設(shè)時(shí),其間凈距不小于0.6m。(4)在平行圖上繪出橋架的路由,要注明橋架起點(diǎn)、終點(diǎn)、拐彎點(diǎn)、分支點(diǎn)及升降點(diǎn)的坐標(biāo)或定位尺寸、標(biāo)高,如能繪制橋架敷設(shè)軸側(cè)圖,則對(duì)材料統(tǒng)計(jì)將更精確。

  (3) When two sets of cable trays are laid in parallel at the same height, the clear distance between them should not be less than 0.6m. (4) When drawing the routing of the tray on a parallel diagram, the coordinates or positioning dimensions and elevations of the starting point, ending point, turning point, branching point, and lifting point of the tray should be indicated. If a cable tray laying axis side diagram can be drawn, the material statistics will be more accurate.

  直線段:注明全長(zhǎng)、橋架層數(shù)、標(biāo)高、型號(hào)及規(guī)格。拐彎點(diǎn)和分支點(diǎn):注明所用轉(zhuǎn)彎接板的型號(hào)及規(guī)格。升降段:注明標(biāo)高變化,也可用局部大樣圖或剖面圖表示。

  Straight line segment: indicate the total length, number of bridge layers, elevation, model, and specifications. Turning and branching points: indicate the model and specifications of the turning joint used. Lifting section: indicate the elevation change, and it can also be represented by local detailed drawings or sectional drawings.

  (5)橋架支撐點(diǎn), 如立柱、托臂或非標(biāo)準(zhǔn)支、構(gòu)架的間距、安裝方式、型號(hào)規(guī)格、標(biāo)高,可同意在平面上列表說明,也可分段標(biāo)出用不同的剖面圖、單線圖或大樣圖表示。

  (5) The spacing, installation method, model specifications, and elevation of bridge support points, such as columns, brackets, or non-standard supports and structures, can be listed and explained on the plane, or segmented and marked with different sectional drawings, single line drawings, or detailed drawings.

  (6)電纜引下點(diǎn)位置及引下方式,一般而言,大批電纜引下可用垂直彎接板和垂直引上架,少量電纜引下可用導(dǎo)板或引管,注明引下方式即可。

  (6) Generally speaking, for a large number of cable leads, vertical bending plates and vertical lead frames can be used, while for a small number of cable leads, guide plates or guide pipes can be used, indicating the lead method.

  (7)電纜橋架宜高出地面2.2米以上,橋架頂部距頂棚或其它障礙物不應(yīng)小于0.3米,橋架寬度不宜小于0.1米,橋架內(nèi)橫斷面的填充率不應(yīng)超過50%。

  (7) The cable tray should be at least 2.2 meters above the ground, and the distance between the top of the tray and the ceiling or other obstacles should not be less than 0.3 meters. The width of the tray should not be less than 0.1 meters, and the filling rate of the cross-section inside the tray should not exceed 50%.

  (8)電纜橋架內(nèi)纜線垂直敷設(shè)時(shí),在纜線的上端和每間隔1.5米處應(yīng)固定在橋架的支架上,水平敷設(shè)時(shí), 在纜線的首、尾、轉(zhuǎn)彎及每間隔3~5米處進(jìn)行固定。

  (8) When the cables are vertically laid in the cable tray, they should be fixed on the brackets of the tray at the upper end and every 1.5 meters. When laid horizontally, they should be fixed at the beginning, end, turn, and every 3-5 meters.

  (9)在吊頂內(nèi)設(shè)置時(shí),槽蓋開啟面應(yīng)保持80毫米的垂直凈空,線槽截面利用率不應(yīng)超過50%。

  (9) When installed in the ceiling, the opening surface of the trough cover should maintain a vertical clearance of 80 millimeters, and the utilization rate of the trough section should not exceed 50%.

  (10)布放在線槽的纜線可以不綁扎,槽內(nèi)纜線應(yīng)順直,槽內(nèi)纜線應(yīng)順直,盡量不交叉,纜線不應(yīng)溢出線槽,在纜線進(jìn)出線槽部位, 轉(zhuǎn)彎處應(yīng)綁扎固定。垂直線槽布放纜線應(yīng)每間隔1.5米固定在纜線支架上。

  (10) The cables laid in the cable trough can be left unbound. The cables inside the trough should be straight and straight, avoiding crossing as much as possible. The cables should not overflow from the trough. They should be tied and fixed at the entrance and exit of the trough, as well as at turns. The cables laid in the vertical cable tray should be fixed on the cable support every 1.5 meters.

  (11)在水平、垂直橋架和垂直線槽中敷設(shè)線時(shí),應(yīng)對(duì)纜線進(jìn)行綁扎。4對(duì)線電纜以24根為束,25對(duì)或以上主干線電纜、光纜及其它信號(hào)電纜應(yīng)根據(jù)纜線的類型、纜徑、纜線芯數(shù)分束綁扎。綁扎間距不宜大于1.5米,扣間距應(yīng)均勻,松緊適度。

  (11) When laying wires in horizontal and vertical cable trays and vertical trunking, the cables should be tied. 4-pair cables should be bundled with 24 cables, and 25 or more pairs of backbone cables, optical cables, and other signal cables should be bundled and tied according to the type, diameter, and number of cable cores. The binding spacing should not exceed 1.5 meters, the buckle spacing should be uniform, and the tightness should be moderate.

  (12)橋架水平敷設(shè)時(shí),支撐間距一般為1.5-3m,垂直敷設(shè)時(shí)固定在建筑物構(gòu)體上的間距宜小于2m。

  (12) When laying the bridge horizontally, the support spacing is generally 1.5-3m, and when laying vertically, the spacing fixed on the building structure should be less than 2m.

  電纜橋架型式及品種的選擇及鋪設(shè)規(guī)范

  Selection and laying specifications for cable tray types and varieties

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected

  2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類復(fù)合環(huán)氧樹脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。

  2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  3、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。

  3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover.

  4、在公共通道或戶外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤 。大跨距跨越公共通道時(shí),可根據(jù)用戶要求提高橋架的載荷能力或選用行架。

  4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements.

  5、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶外要選用復(fù)合環(huán)氧樹指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、電纜橋架規(guī)格選擇

  2、 Selection of cable tray specifications

  1、復(fù)合環(huán)氧樹脂電纜橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量。

  1. The width and height of the composite epoxy resin cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% formula development margin should be reserved.

  2、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套。

  2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame.

  3、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿足荷載的要求。

  3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load.

  4、橋架橫截面積的選擇見表橋架上電纜網(wǎng)絡(luò)中任一線路的自動(dòng)過電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)0-60 12961-100 258101-200 452201-400 645401-600 968

  4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the cable tray (A). The minimum allowable cross-sectional area of the cable tray (mm2) is 0-60 12961-100 258101-200 452201-400 645401-600 968

  三、對(duì)于電纜橋架的支、吊架的配置

  3、 Configuration of supports and hangers for cable trays

  1、戶內(nèi)支、吊短跨距一般采取1.5-3m。戶外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線段與直線結(jié)合處300-600m的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、拉擠玻璃鋼電纜橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of extruded fiberglass cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火:要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。

  4、 Fire prevention: Steel or non combustible and flame-retardant materials must be used in the sections where bridge frames are required to be fire-resistant.

  五、拉擠玻璃鋼電纜橋架的接地

  5、 Grounding of extruded fiberglass cable tray

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)橋架應(yīng)少有一點(diǎn)與接地干線可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容:橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  6、 Bridge system design content: The bridge system engineering design should be closely coordinated with civil engineering, technology, and related disciplines to determine the optimal layout. Its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。2、橋架系統(tǒng)的平面布置圖。3、橋架系統(tǒng)所需直線段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說明。4、有特殊要求的非標(biāo)件技術(shù)說明或示意圖。

  1. Relevant sectional drawings of the bridge system. 2. Layout plan of the bridge system. 3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations. 4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝:電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》。

  7、 Installation: For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠家配齊。4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說明或示圖。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements. 4. Non standard technical specifications or diagrams with special requirements.

  一、電纜橋架型式及品種的選擇

  1、 Selection of cable tray types and varieties

  1、需屏蔽電氣干擾的電纜網(wǎng)路或有防護(hù)外部(如:有腐蝕液休,易燃粉塵等環(huán)境)影響的要求時(shí),應(yīng)選用(FB)類槽式復(fù)合型防腐屏蔽電纜橋架(帶蓋)   2、強(qiáng)腐蝕性環(huán)境應(yīng)采用(F)類復(fù)合環(huán)氧樹脂防腐阻燃型電纜橋架。托臂、支架也要選用同樣材料,提高橋架及附件的使用壽命,電纜橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。  3、除上述情況外,可根據(jù)現(xiàn)場(chǎng)還環(huán)境及技術(shù)要求選用托盤式、槽式、梯級(jí)式、玻璃防腐阻燃電纜橋架或鋼質(zhì)普通型橋架。在容易積灰和其它需遮蓋的環(huán)境或戶外場(chǎng)所宜加蓋板。  4、在公共通道或戶外跨越道路段,底層梯級(jí)的底部宜加墊板或在該段使用托盤 。大跨距跨越公共通道時(shí),可根據(jù)用戶要求提高橋架的載荷能力或選用行架?! ?、大跨距(>3m)要選用復(fù)合型橋架(FB)。

  1. When it is required to shield cable networks from electrical interference or to protect against external influences (such as corrosive liquids, flammable dust, etc.), (FB) type slot type composite anti-corrosion shielding cable trays (with covers) should be selected. 2. For highly corrosive environments, (F) type composite epoxy resin anti-corrosion and flame-retardant cable trays should be used. The same materials should be used for the support arm and bracket to improve the service life of the cable tray and accessories. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 3. In addition to the above situations, tray type, trough type, step type, glass anti-corrosion and flame-retardant cable trays or steel ordinary cable trays can be selected according to the on-site environment and technical requirements. Cover plates should be added in environments or outdoor places that are prone to dust accumulation and require cover. 4. When crossing public passages or outdoor road sections, it is advisable to add padding or use pallets at the bottom of the lower steps. When crossing public passages with large spans, the load capacity of the bridge frame can be increased or a scaffolding can be selected according to user requirements. 5. Composite cable trays (FB) should be selected for large spans (>3m).

  6、戶外要選用復(fù)合環(huán)氧樹指橋架(F)。

  6. Choose composite epoxy tree finger bridge (F) for outdoor use.

  二、規(guī)格選擇

  2、 Specification selection

  1、橋架的寬度和高度就按下表選擇,并應(yīng)符合電纜真充率不超過有關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值,動(dòng)力電纜可取40-50%,控制電纜可取50-70%,另外需予留10-25%的式程發(fā)展余量?! ?、各種彎通及附件規(guī)格應(yīng)符合工程布置條件并與橋架相配套?! ?、支、吊架規(guī)格的選擇,應(yīng)按橋架規(guī)格、層數(shù)、跨距等條件配置。并應(yīng)滿足荷載的要求?! ?、橋架橫截面積的選擇見表   橋架上電纜網(wǎng)絡(luò)中任一線路的自動(dòng)過電流保護(hù)的額定電流值或整定值(A) 橋架橫截面充許小值(mm2)   0-60 129   61-100 258   101-200 452   201-400 645   401-600 968

  1. The width and height of the cable tray should be selected according to the table below, and should comply with the specified values of the cable true filling rate not exceeding the relevant standard specifications. The power cable can be taken as 40-50%, the control cable can be taken as 50-70%, and an additional 10-25% of the formula development margin should be reserved. 2. The specifications of various bends and accessories should comply with the engineering layout conditions and be compatible with the bridge frame. 3. The selection of support and hanger specifications should be configured according to the specifications, number of layers, span, and other conditions of the bridge frame. And it should meet the requirements of the load. 4. The selection of the cross-sectional area of the cable tray is shown in the table. The rated current value or setting value of the maximum automatic overcurrent protection for any line in the cable network on the tray (A). The minimum allowable cross-sectional area of the tray (mm2) is 0-60 129 61-100 258 101-200 452 201-400 645 401-600 968

  三、支、吊架的配置

  3、 Configuration of supports and hangers

  1、戶內(nèi)支、吊短跨距一般采取1.5-3m。戶外立柱中跨距一般采取6m。

  1. The short span of indoor supports and hangers is generally 1.5-3m. The mid span of outdoor columns is generally 6m.

  2、非直線段的支、吊架配置就遵循以下原則。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線段與直線結(jié)合處300-600m的直線段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),除符合下述條件外,在非直線段中部還應(yīng)增設(shè)一個(gè)支、吊架。

  2. The configuration of supports and hangers for non-linear sections follows the following principles. When the width of the bridge is less than 300mm, a support and hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, in addition to meeting the following conditions, a support or hanger should be added in the middle of the non-linear section.

  3、橋架多層設(shè)置時(shí)層間中心距為200,250,300,350mm。

  3. When setting up multiple layers of cable trays, the center distance between layers is 200250300350mm.

  4、橋架直線段每隔50m應(yīng)予留伸縮縫20-30mm(金屬橋架)。

  4. Expansion joints of 20-30mm (metal bridge) should be left every 50m in the straight section of the bridge.

  四、防火

  4、 Fire prevention

  要求橋架防火的區(qū)段,必須采用鋼制或不燃、阻燃材料。我公司生產(chǎn)的BJⅢ系列電纜橋架均為防火橋架。

  The section requiring bridge fire prevention must be made of steel or non combustible and flame-retardant materials. The BJ III series cable trays produced by our company are all fire-resistant trays.

  五、接地

  5、 Grounding

  1、橋架系統(tǒng)應(yīng)具有可靠的電氣連接并接地(只對(duì)金屬橋架)。

  1. The cable tray system should have reliable electrical connections and grounding (only for metal cable trays).

  2、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí)應(yīng)符合下列要求。橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線接地相連。裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。

  2. When it is allowed to use a bridge system to form a grounding main circuit, the following requirements should be met. The connection resistance between the ends of the bridge should not exceed 0.00033 ohms, and the insulation coating should be removed from the grounding hole. In a neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected to the neutral line grounding of the system. When installing a power cut-off device, the cross-sectional area of the metal in the longitudinal direction of the bridge should not be less than the specified value.

  3、沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)橋架應(yīng)少有一點(diǎn)與接地干線可靠連接。

  3. When laying a grounding main line along the entire length of the bridge, each section (including non-linear sections) of the bridge should have at least one point reliably connected to the grounding main line.

  4、對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。

  4. For vibration sites, spring coils should be installed at the connection of the grounding point.

  六、橋架系統(tǒng)設(shè)計(jì)內(nèi)容

  6、 Design content of bridge system

  橋架系統(tǒng)工程設(shè)計(jì)應(yīng)與土建、工藝以及有關(guān)密切相配合以確定布置,其設(shè)計(jì)內(nèi)容可含有:

  The design of bridge system engineering should be closely coordinated with civil engineering, technology, and relevant disciplines to determine the optimal layout, and its design content may include:

  1、橋架系統(tǒng)的有關(guān)剖面圖。

  1. Relevant sectional drawings of the bridge system.

  2、橋架系統(tǒng)的平面布置圖。

  2. Layout plan of the bridge system.

  3、橋架系統(tǒng)所需直線段、彎通、支、吊架規(guī)格和數(shù)量的明細(xì)表以及必要的說明。

  3. A detailed list of specifications and quantities of straight sections, bends, supports, and hangers required for the bridge system, along with necessary explanations.

  4、有特殊要求的非標(biāo)件技術(shù)說明或示意圖。

  4. Technical specifications or diagrams for non-standard parts with special requirements.

  七、安裝

  7、 Installation

  電纜橋架的安半夜請(qǐng)參照建筑標(biāo)準(zhǔn)設(shè)計(jì)研究院所發(fā)行的JSJT-121全國(guó)通用建筑標(biāo)準(zhǔn)設(shè)計(jì)-電氣裝置標(biāo)準(zhǔn)圖集《電纜橋架安裝》04D701-3。

  For the installation of cable trays, please refer to the JSJT-121 National General Building Standard Design Electrical Equipment Standard Atlas "Cable Tray Installation" 04D701-3 issued by the China Building Standards Design and Research Institute.

  八、設(shè)計(jì)要求

  8、 Design requirements

  1、橋架系統(tǒng)的路徑平面布置圖;

  1. Layout plan of the cable tray system path;

  2、橋架系統(tǒng)的有關(guān)斷面圖。

  2. The relevant cross-sectional diagram of the bridge system.

  3、橋架系統(tǒng)所用防腐材質(zhì)及所需直通、彎通、支(吊)架等的規(guī)格和數(shù)量明細(xì)表以及必要的說明,連接板及螺絲、防護(hù)帽按以上要求由生產(chǎn)廠家配齊。

  3. The anti-corrosion materials used in the bridge system, as well as the specifications and quantities of the required straight through, bent through, support (suspension) frames, and necessary explanations, shall be detailed. The connecting plates, screws, and protective caps shall be provided by the manufacturer in accordance with the above requirements.

  4、有特殊要求的非標(biāo)準(zhǔn)技術(shù)說明或示圖。

  4. Non standard technical specifications or diagrams with special requirements.

  本文由  濟(jì)南電纜橋架  友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊  http://chenchen1688.com/  真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

  This article is a friendly contribution from Jinan Cable Bridge For more related knowledge, please click http://chenchen1688.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
国产丰满人妻一区二区电影 | 亚洲色综合| 蜜臀AV免费在线观看| 人妻夜夜爽爽88888视频| 大香蕉777| 高清国产天干天干天干不卡顿| 国产综合一区二区| 日本熟女做爱| 麻豆文化传媒APP免费看 | 牛av在线| 乱熟女高潮一区二区在线| 欧美干B骚荡货| 丁香花在线电影小说观看| 欧美黄色性爱| 欧美久久久久久久久久| 日韩精品久久久肉伦网站| 日韩一品二品三品| 超碰人人人人| 狠狠干2019| 少妇高潮在线观看| 激情综合丁香五月| 97超碰在线播放| 国产h在线| 黑人巨大精品一区二区三区免费| 久99久热只有精品国产99| 丁香六月激情综合| 久操婷婷| 无码三区四区| 国产精品高清电影| 久久一区二区三区精品| 久久综合成人| 色色婷婷五月天| 狠狠干在线视频| 99久久无码一区人妻A片蜜桃| 999精品视频在这里| 久久91久久91精品免费观看| 精品久久久爽爽久久久AV| 后入少妇| 日韩视频无码| 午夜石榴视频| 亚洲综合日韩在线| 人妻无码中文在线| 99在线精品免费视频| 大香线蕉视频在线观看| 国产又粗又大又黄的视频| 大香蕉97| 麻豆影视文化传媒有限公司在线观 | 无码人妻丰满| A片做爰片仑理片免费看| 亚洲阿v天堂在线2017免费| 调教美女网站| 亚洲成人一区在线观看| 成年人黄色小视频| 黑人一区二区三区四区五区| 国产91色| 成人无遮挡18禁免费视频| 日本久久精品少妇无码一区色大师| 五月天亚洲av| 欧美精品久久久久久久小说| 久久成年人视频| 日韩aV一级毛片| 国产精品美女久久久久| 亚洲日本欧美日韩中文字幕| av天天操| 欧美在线观看视频| 亚洲久久天堂| 久久久久久久久91| 免费观看拍拍1000视频| 欧美 亚洲 日本| 久久久久国产一区| 日本精品无人区卡1.卡| 成人视频高清无码| 亚洲AV毛片| 成全视频高清在线观看| 精品成人毛片| 久久久久无码精品| 久久青草在线视频精品| 免费看黄的视频| 午夜精品久久久久久影视riav| 呦呦av| 欧美性爱视频久久| 日韩电影一区二区三区| 亚洲黄色激情视频| 国产精品沙发午睡系列| 卡一卡二卡三国产拍| 四虎成人永久免费视频| 亚洲女同一区二区| 午夜人妻无码AV一区二区| 天堂成人网| 婷婷视频在线| 国产精品手机视频| 亚洲激情精品| 成全视频观看免费观看| 69国产精品成人无码视频色| 日韩一级片| 91久久网| 草网站| 大地资源影视中文二页| 无码电影一区二区三区| 亚洲天堂国产精品| 亚洲高清炮| 黑人另类| mdapptv麻豆下载| 99久久久久久久久久久久无码| 精品一区二区三区在线播放| 欧美一区二区视频在线观看| 亚洲AV无码成人WWW| heyzo极太黑炮爱乃娜美先锋| 久久精品国产一区二区三区四区| www.日日| 五月综合视频| 亚洲国产精品毛片AV不卡下载| 午夜伦理不卡片2018免费撞 视频| 精品免费一区二区三区四区| 色一情一伦一子一伦一区| 无码日本亚洲一区久久精品| 精品在线不卡| 精品 在线 视频 亚洲小说| xxx一区| 亚洲一区电影| 日日射视频| 97人人看| 欧美 亚洲 另类 激情 另类| 青青草欧美| 大地资源二中文在线播放| 亚洲视频不卡| 欧美人与禽ZOZO性伦交视频| 日韩欧美成人一区二区| 9191在线| 欧美激情一二三| 国产亚洲AV片天天在线观看| 久久久成人一区二区免费影院| 婷婷在线视频| A片A三女人久久7777| 操人妻在线| 国产日韩高清一区二区三区| 国产精品福利导航| 丰满大码的熟女在线观看| 中文无码视频在线观看| 国产91专区| 成人福利网址| 国产一区在线视频| 97无码精品人妻一区二区三区麻豆| 丁香五月开心婷婷| 伊人久久综合精品蜜桃97| 天天日天天操天天干| 无码电影一区| 最近中文字幕高清中文字幕电影二| 中文字幕国产视频| www日韩精品| 色欲久久综合亚洲精品蜜桃| 久久夜色网| 色吊丝永久性观看网站| 色欲人妻AV一区二区三区| 床震吃奶摸下成人A片在线观看| 色情欧美一区二区久久夜爽| 久久久九色综合亚洲成色777 | 香蕉www.5.app网页在线| 91无码在线视频| 2021国产精品国产精华| 色呦呦视频在线观看| 亚洲AV无码一区二区三区乱子伦 | 久久久三级片电影| 暖暖视频免费高清完整| 国产欧美一区二区三区精品酒店 | 性夜夜春夜夜爽A片欧美| 香蕉久久综合网| 国产亚洲精品VA片在线播放| 日本电影二区| 欧美性猛交XXXX乱大交极品| 亚洲热视频| www.色94色.com| 狠狠操91| 九九久久一区二区| 欧美一区二区三区在线| 四虎综合| 日产久久视频| 婷婷五月天网| 九九激情视频| 久久精品国产亚洲AV麻豆蜜芽| 国产精品久久久久久久久久元玛| 91人妻人人做人碰人人爽九色| 国产精品无码一区二区三区京香郡| 拔擦拔擦8X永久华人免费播放器| 日本福利一区二区| 亚洲 图 欧洲 自拍 图片| 国产精品一二三区视频出来一| 日本网站大全黄页| 日本免费www| 精品成人网站| 暖暖视频免费最新在线观看| 亚洲AV毛片成人精品| 国产亚洲精品久久久999功能介绍| 久久精品国产亚洲AV日韩| 538在线观视频免费观看| 成熟女人毛片WWW免费版在线| 青青草原高清无码| 婷婷国产| 91香蕉短视频| 天堂网在线观看| 四虎影视免费在线观看| 国内精久久久久久久久久久| 青草草97久热精品视频| 色男天堂| 天堂资源中文| 无码人妻精品一区二区三区20| 国产精品2020| 北岛玲手机在线观看视频观看| 91国内精品| 久久人人槡人妻人人玩夜色AV| 国产精品久久久久久久久久浪潮 | 欧美少妇喷水| 一道本免费视频| 国产精品17c| 午夜无码熟熟妇丰满人妻视频| 麻豆传煤网站网址入口| 中文字幕Aⅴ人妻一区二区| 欧美成人野战| 亚洲AV久久久精品麻豆| 亚洲少妇熟女| 日产久久视频| 亚洲A片成人无码久久精品色欲 | 亚洲AV实录无码成人精品电影| 欧美片第1页 综合| 97成人网站| 波多野结喷水最猛一部352| 欧美老熟妇xb水多毛多| 麻豆美女裸体AAAA片| 暖暖 免费 高清 日本视频下载| 欧美成人一区二区三区高清| 日逼视频看看| 国产成人不卡AV在线观看| 天堂资源AV| 99热91| 日韩av毛片| 午夜无码av| 18勿入网站免费永久| 国产三级在线观看完整版| 亚洲avwww| WWW亚洲精品久久久无码| 97国产成人无码精品久久久| 精品国产鲁一鲁一区二区91视| 香蕉人妻AV久久久久天天| 麻豆人妻少妇精品无码专区| 日本一区免费视频| 亚洲情综合五月天| 午夜爽爽爽| 国产无码黄片| 美女久久久久久久久| 色倩网站大全免费| 自拍偷拍综合| 欧美性爱视频免费看| 麻豆视传媒app官方| 日日操夜夜操狠狠操| 精品成人网站| 国产高清无密码一区二区三区| 五月婷婷开心网| 午夜伦理视频| 欧美精品一卡二卡| 亚洲VA韩国VA欧美VA| 欧美调教| nba录像回放| 最近2018年中文字幕免费下载| 欧美日韩视频一区二区| 亚洲1区第2区第3区第4| plus成人论坛| av无码精品一区二区三区宅噜噜 | 99精品国产乱码久久久人妻| 吃女王的浓痰和鼻涕视频| 手机午夜福利1000视频| 久国产精品| 91天天爽| 日韩无码成人电影| 麻豆文化传媒官方网站| 九色最新网址| 中文亚洲字幕| 亚洲久久色| 巨胸喷奶水WWW冈哺乳期| 丁香五月婷婷在线视频| 国产精品美女一区二区| 久久一区二区三区精品| 蝌蚪窝最新释放地址| 人妻中文无码| 日韩无码熟妇| 欧美成人精品一区二区三区精品| 成人网站CRM| 91精品一区| 一本色道精品综合久久无码人妻 | 人妻人人操人人爽| 少妇精品视频一区二区| 东京热系列| 在线播放亚洲无码| 亚洲无码一级| 日本高清网站| 少妇一区精品久久麻豆| 日本污ww视频网站| 久在线观看福利视频| 久草热视频| 老司机福利av| 99re国产在线观看| 国产AV一区二区三区日韩| 暖暖直播免费观看韩国| 亚洲爽图| 超碰熟妇| 国产成人精品亚洲线观看| 国自产偷拍精品| 影音先锋AV成人资源站在线播放| 日韩一级黄片| 黄色成人在线| 亚洲天堂av电影| 久久免费在线| 99久久精品费精品国产| 噼里啪啦在线看免费观看直播| 日韩狠狠| 久久欧美视频| 久久久三级电影| 麻豆传媒AV在线观看| 国精产品自线六区| 2019最新国产理论| 国产精品无码一区二区三区太| 日韩乱伦免费视频| 国产午夜三级片| 亚洲最大成人影院| 亚洲精品久久久久久久久久飞鱼 | 欧美色偷偷亚洲天堂bt| 久久精品国产亚洲AV麻豆蜜芽| 无码国模在线观看视频| 超薄丝袜连裤袜一二三区| 久久视频成人黄色| 麻豆视传媒短视频网站-入口2021 麻豆传煤官网APP免费网站在线 | 国产丨熟女丨国产熟女在线| 日韩欧美一二三| 国产激情久久久久| 婷婷综合一区| 日日日噜噜噜| 少妇又紧又爽又丰满A片小说| MD传媒免费进入在线观看| 亚洲欧美综合| 人妻无码中文字幕| 欧美一本道| 日本精品免费一区二区三区| 久久毛片网| 大地资源影视中文二页 在线观看| 99RE6这里有精品热视频| 日韩成人综合| 黄色av成人| 手机在线成人AV| 色情欧美一区二区久久夜爽| 又黄又粗又大视频| 99久久无码国产精品性出奶 | 一本无码AV| 日产精品久久久| av中文字幕| 大地资源网中文在线观看| 538在线在视观看视频| 少妇毛片一区二区三区| 亚韩无码| 无码一二三四| 精产国品一二三区| 91综合视频| 成人久久精品| 美女张开大腿让男人桶| 国产精品久久久久久久漫画软件| 久艾草在线精品视频在线观看| 麻豆天美传煤短视频| jizz孕妇孕交| 国产v片| 国产91精品看黄网站在线观看| 日韩欧美不卡视频| 7799日日夜精品日日夜精品| 国产无码黄片| 国产精品久久网| 91精品国产91久久久无码医生| 91嫩草国产丨精品入口麻豆| AV中文字幕网站| 99热这里只有精品8| 18进禁邪恶动态图| 在线偷拍视频精品视频 | 欧美一区二区三区久久综合 | 欧美午夜精品A片一区二区HD | 另类小说亚洲| 公车上疯狂高潮呻吟摸揉| 暖暖日本免费观看更新2019| 亚洲精品综合五月久久小说| 欧美日韩中文字幕在线视频| 国产精品三级| 99re在线视频精品| 久久无码人妻精品一区二区三区| 无码精品人妻一区二美国区三区| free性玩弄少妇hd| 国产夫妻在线| 欧美成人精品三级网站| 粉嫩AV网| 日韩影院一区二区| 国产精品免费AV一区二区| www.日韩.com| AV一区二区无码| 成人免费视频一区二区三区| 少妇裸体性生交| 久久乐播| 国产偷伦| 国产日产无码欧美激情精品| 国产一卡二卡三卡| av啊啊啊啊| 麻豆精品网站| 日本三级少妇| 亚洲AV人人爽人人夜| 久久久精品人妻一区三区蜜桃| 美女Av网址| 久久av高潮aV| 日日好av| av天堂东京热| 狠狠爱大香蕉| 亚洲综合色网| 乱伦对白| 国产精品九九| 自拍亚洲在线播放视频| 秋葵加油站APP下载地址入口| 国产精品久久久久久久久99热| 福利 无码 三级 视频| 男人大JI巴做爰呻吟视频男男| 最近中文2019字幕第二页| 深夜迷情| 亚洲 日韩 中文 制服| 中文无码乱人伦中文视频播放| 国产日韩高清一区二区三区| 久久AV无码精品人妻系列试探| 精品国产亚洲午夜精品AV| 国产日产精品久久快鸭的功能介绍| 国产AV一区二区三区人妻| 老鸭窝视频在线观看| 大地影视第二页官方网站| 国产色图在线观看| 五月天.com| 久久嫩草AV| 国产人妻14p| 亚洲黄色电影网站| 婷婷精品在线| 大香蕉内射| 国产欧美一级A片无码免费下| 亚洲日本色图| 鲁鲁网站| 久久久99精品免费观看| 亚洲精品综合五月久久小说| 久久久国产精品免费看| 久久AV无码精品人妻系列试探| 色欲国产麻豆精品AV免费| 国产精品兄妹在线观看麻豆| 啊啊啊啊啊嗯嗯| 国产又黄又粗又长| 后入内射无码人妻一区| 97人妻人人揉人人躁原| 欧美 日韩 高清| WWW国产精品内射老熟女| 国产无码久久久久| 国产伦精品一区二区三区在线| 狠狠操av| 开心四房播播| 麻花传MDR国语免费版董小宛| 无码人妻精品一区二区三区蜜| 亚洲AV无码成人毛片| 亚洲精品99999| 亚洲精品一区二区口爆| 99热国内精品| 人妻少妇av中文字幕乱码牛牛| 亚洲激情在线观看| 一日本道伊人久久综合影| 内射一面膜上边一面膜下边| 国产熟女白浆精品视频2| 久久亚洲第一| 午夜久久无码成人免费AV麻豆婷| 久久频| 国产精品久久久精品| 超碰在线无码| 五月色区| 在线A亚洲老鸭窝天堂AV高清| 国产 欧美 亚洲 中文字幕| 激情视频激情小说| 无码网站在线观看| 亚洲色美女| 精品国产一区二区三区无码| 无套内谢的新婚少妇国语播放| 麻豆视传媒短视频的服务行业| 大地资源二在线观看官网| 91久热| 91人妻人人做人人爽九色| 亚洲大尺度无码| 国产丝袜精品丝袜| 久久99视频| 久久这里只有精品1| 大地二资源网高清免费播放小说| 又黄又粗视频| 亚洲国产大片| 无码精品一区二区三区99不| 国产无码专区| 暖暖直播在线观看免费| 久久精品视在线-2| 国产精品久久91| 先锋色资源| 中文字幕精品久久久| 成人欧美一区二区三区黑人免费| 99久久国产露脸精品国产麻豆| 麻豆AV无码精品一区二区| 精品一级| 无码人妻aⅴ一区二区三区日本| 欧亚乱熟女一区二区在线| 日本午夜视频在线观看| 最近中文字幕高清字幕免费MV| 少妇三级全黄| 成人免费视频一区二区三区| 国产精品日韩精品| 在线欧美中文字幕农村电影| 亚洲精品久久久久77777| 少妇一区精品久久麻豆| 日韩AV综合在线| 欧美日韩久久精品| 亚洲国产日韩欧美高清片a| 69精品国产久热在线观看| 三级视频黄色| a片一区二区三区| 亚洲成人免费| 69久久国产精品热88人妻| 亚洲精品91天天久久人人| 97精品视频在线| 国产日韩欧美性爱| 欧美中文字幕一区二区| 久久精品无码人妻无码AV蜜臀| 国产成人精品午夜动态图 | www.AV欧美| 色综合欧美| 激情五月婷婷丁香| 欧美性猛交 XXXX 乱大交| 密臀AV在线| 午夜视频网址| 四虎影院网| 最近中文字幕高清中文字幕2018| 久久精品视频7| 少妇一级淫片50分钟| 国产一二三四五区| 日产高清卡一卡二卡VA| 欧美h视频在线观看| 亚洲高清中文字幕免费| 亚州天堂无码| 三级三级久久三级久久18| 在线观看国产| 色av综合| 综合国产| 麻豆AV久久无码精品久久| 2019香蕉视频在线观看| 国产黄色三级片视频| 色淫网站| 中字幕视频在线永久在线观看免费| 丰满岳乱妇一区二区三区| 手机在线亚洲国产精品| 91亚洲综合| 日本熟妇丰满| 中文字幕日本在线观看| 极品美鲍一线天| 亚洲一个色| 地铁顶臀精品视频www| 久久三级网| 综合色综合| 男女交性视频免费播放视频| 94色94色永久网站| 蜜臀av一区二区三区无码蜜臀| 无码人妻av免费一区二区三区| 日本欧美国产| 大地资源网在线观看入口 | 国产精品999久久久| 97久久精品视频| 中文字字幕在线乱码| 日本三级片一区| 亚洲色天| 亚洲精品综合五月久久小说| 超碰99热| 欧美成人毛片免费| 伊人久久综合视频| 激情五月天影院| 五月色播影音先锋| 麻豆传煤官网入口在线网站| 丰满人妻老熟妇伦人精品| 亚洲天堂资源| 在线视频久久只有精| 91在线丨porny丨国产| 亚洲一区二区三| 久久久日韩精品一区二区| 婷婷精品在线| 日韩高清无码不卡| 久久人妻无码毛片A片涩天使| 黄色电影亚洲| 人妻互换一二三区激情视频| 麻豆传煤网站入口直接进入不用| 亚洲 日韩 中文 制服| 亚洲一区免费| 99久久久无码国产精品不卡| 最近中文字幕在线的MV视频| 欧美怡红院在线观看| 国产精品国产精品国产专区不卡| 亚洲精品A片99久久久久| 国产精品久久久久久人妻精品动漫| 亚洲AV丰满熟妇在线播放| 国产人妻久久精品二区三区特 | 欧美一区二区三区久久综合| 国产精品毛片大码女人| 大地资源网最新在线播放| 成人7777| 一区二区熟女| 丁香美女社区| 国产毛片精品| 欧美激情久久久久久| 五月丁香六月婷| 日韩av毛片| 欧美日韩性爱在线观看| 精品国产乱码久久久久久108 | 亚洲午夜成人电影| 四虎影院成人| 久久草国产| 尹人在线视频| 一个人看的在线观看视频最新| 亚洲蜜臀av乱码久久精品蜜桃| 国产一级一片免费播放i| 91亚洲综合| 日本午夜视频| 99久久精品费精品国产| 免费黄色小说在线观看| 欧美日韩人妻中文字幕综合| 91麻豆国产精品91久久久| 在线黄片免费看| 免费99精品国产自在在线| 超碰天天日| 亚洲综合久久网| 国产亚洲精品久久久久久777| 国产一级内射| 国产精品国产高清国产| 野花视频免费观看2019| 人妻天天| jazzjazz国产精品传媒| 99视频69e精品视频| 影音先锋麻豆| 欧美日韩无套内射另类| 伊人天天干| 欧美日韩视频一区二区| 欧美国产激情二区三区-免费A片| 亚洲AV999| 大地资源二中文官网入口| 五月丁香在线视频| 中文无码第3页不卡av| 极品少妇喷水| 人妻无码AV波多野结衣| 国内精品久久久久| 日产久久视频| 一区二区视频在线播放| 欧美激情一二三区| 2017亚洲天堂| 人人妻人人澡人人妻人人爱| 色偷偷偷偷| 在线观看网址入口2020| 成人激情在线观看| 久久久久久久国产免费看| 少妇又紧又黄又粗又爽在线观看| 草莓官方官网进口| 国精品无码一区二区三区| 国产精品久久久乱弄| 日韩少妇一区二区三区| 日韩无码成人电影| 婷婷在线视频| 国产成人不卡AV在线观看| 精品视频久久久久久久| 亚洲欧美视频一区| 日本午夜视频| 老色批av| 无码免费人妻A片AAA毛片西瓜| 又黄又湿的网站| 久草在线最新免费播放| 人妻精品久久久久中文字幕影院| 尤物视频最新网址| 丰满人妻中文字幕在线观看| 午夜少妇福利| 久久精品国产亚洲AV成人婷婷 | 亚洲激情网址| 大地资源二在线视频观看| 男人天堂无码| 人人干视频| 亚洲午夜福利在线观看| 2020国自产拍精品天天更新| 中文字幕日本人妻久久久免费| 精品视频久久久久久久| 国产欧美精品AAAAAA片| 黄色成人三级片| 色情久久久AV熟女人妻网站| 中文一级黄片| 777影院秋霞成人午夜电影免费| 人妻丰满熟妇Av无码区 | 在线欧美 精品 第1页| 在线亚洲一区二区| 日欧一片内射VA在线影院| av无码偷拍| 亚洲视频在线观看2018| 免费无码又爽又黄又刺激网站| 26uuu图片站| 少妇特殊按摩高潮惨叫无码| 免费a级做爰片免费视频海外直播| 亚洲一级无码毛片| av电影久久| 麻豆传媒直播app下载官网| 欧美一级特黄A| 久久久无码A片观看免费| 五月丁香激情综合久久| 欧美精品 - 色哟哟| 国产性―交―乱―色―情人| 中文熟女五十乱码在线| 无码日本精品XXXXXXXXX| 神马伦理影院| 97免费线观看2018| 另类欧美亚洲| 国产乱伦二区| 人妻无码AV中文系列免费| 国产精品久久久久久妇女6080| 久久在精品线影院| 日韩精品一区二区三区在线播放| 国产精品久久久久久人妻精品流| 激情六月丁香| 亚洲福利久久| 国产成人精品综合在线观看| 日韩aV一级毛片| 四虎必出精品亚洲高清| 日韩精品中文字幕视频| 国产综合91| 波波成人网| 无码精品一区二区三区99不| 黄片香蕉视频| 久久久久无码| 麻豆网站少妇aaa片| 69久久国产露脸精品国产| 人妻中文无码| 欧美乱伦XXX| 中文区中文字幕免费看| 美女张开腿让男人| 美女被操爽了| 天天看片视频免费观看| 一区二区在线观看免费视频| 日韩AV片无码一区二区三区不卡| 久久精品国产成人AV| 国精品va无码一区二区25| 一本本月无码-| 日韩无码视频专区| www.AV日韩| 秋葵加油站APP下载地址入口| 午夜精品99| 亚洲第一网| 91亚洲精品乱码久久久久久蜜桃| 欧美1级| 亚洲高清炮| 欧美亚洲激情| www黄片com| 国产SUV精品一区二区四区三区| 久久亚洲一区二区三区四区五区| 国产一区二区不卡在线| 久久99AV无色码人妻蜜| 中文字幕一区三区| 麻豆精品91| A片人人澡C片人人人妻蜜臀| 亚洲精品乱码久久久久久蜜桃图片| 精品91久久久久久| 成人网站YSL千人千色| 日韩色色影院| 亚洲美女性爱| 国产99久一区二区三区A片| 亚洲av色图| 国产一级av片| 欧美另娄| 久久最新网址| 亚洲丝袜av| 在线观看黄色国产| 国产毛片精品一区二区色欲黄A片| 91精品国产综合久久国产大片| 久久婷婷激情| 青青草国语| 国产精品久久久久久中文字| 97狠狠| 最好最新高清中文字幕| 男人的天堂在线| 日本黄色网址在线观看| jlzzzjlzzz国产免费观看| 手机午夜福利1000视频| 五月婷婷丁香五月| 无码人妻精品一二三区免费百度| 五月婷婷六月丁香动漫| 三级在线观看| 男人扒女人添高潮视频| 天堂资源在线播放| 大地影视中文资源官网| 人人妻人人玩人人爽| 精品无码中出| 亚洲中文字幕国产综合| 九九影视| 中文字幕一区二区爆乳嫁中文在线| 色欲偷拍综合| 最近中文字幕完整版2018免费| 无码中文字幕| 国产成人精品亚洲线观看| 亚洲一区二区三区四区电影| 3344永久在线观看视频| 国语自产偷拍精品视频偷97| 精品一区二区三区免费毛片| 【乱子伦】国产精品www| 麻豆视传媒短视频免费观看 | 日本久久在线| 中文字幕免费无线观看| 丁香婷婷五月情天| 99国产精品99久久久久久粉嫩| 国产精品无码一区二区三区京香郡 | 蜜桃视频成人A片免费观看| 91精品国产色综合久久不卡电影| 国产av最新网址| 一级欧美大片| 2019久久这里只精品热在线观看| 色婷婷影院| 日本护士毛茸茸高潮| aaa无码| 中文字幕无线观看中文字幕| 传媒APP免费网站入口| 亚洲AV无码乱码精品护士岛国| 免费试看av| 日本一区免费| 色婷婷狠狠97成为人免费 | 麻豆传播媒体网站| 亚洲精品三级片| 人妻久久久久| 93久久| 欧美一区二区三区久久综合 | 丁香四房播播| 久久囯产精品99蜜桃传媒| 日本一区免费观看| 亚洲无码网址| 中文字幕A片视频一区二区| 麻豆短视频传媒网站| AV一二三四区| 日本一级免费视频| 人妻无码中文字幕精品影视| MD传媒免费网站入口IOS区 | 久久久国产精品免费A片分环卫 | 久久久噜噜噜| 午夜动态图| 日本国产视频| 非洲人与牲动交CCOO| 亚洲精品伦理熟女国产一区二区| 日韩无码黄片| 国产精品视频一区二区三区不卡| 国产亚洲综合无码| 免费看日本黄色片| 亚洲AV网站| 97SE亚洲国产综合自在线不卡| 成人区精品一区二区婷婷| 午夜久久久久久久| 日本一区二区在线免费观看| 久久精品亚洲作者| 成人久久18免费软件| 日韩色情无码免费A片| 亚洲Av人人澡人人爽人人夜夜| 四季av在线| 欧美特一级黄片| 亚无码久久久久精品一牛| 神马电影院午夜神福利不卡| 中文字幕人妻丰满熟女| 国产精品久久久久毛片大屁完整版| 爆乳一区二区| 91精品国产乱码久久| 日韩高清无码黄片| caoporn超碰 在线观看| 最近最新中文字幕高清免费| 亚洲精品久久AV无码一区二| 人成视频在线免费观看| 牛av在线| 成人依依| 日韩精品少妇一二三区免费Av| 内射中出| 首页 图区 国产 亚洲 欧美| md豆传媒app地址入口免费看| 青青草国产精品| 中文精品在线| 欧美疯狂性受XXXXX喷水影院| 国产毛片毛片毛片毛片毛片| 日本毛片免费看| 涩涩涩| 青青草大香焦在线综合视频| 久草丁香| 国产情侣普通话刺激对白| 西瓜影院| 亚洲精品aaa| 操逼视频123| 久久九九国产精品| 日本欧美一区二区三区不卡视频| 国产一区二区三区四区精| 久久精品视频91| 538prom精品视频我们不只是| MD传媒免费观看在线小说| 欧美日韩精品中文字幕| 人与野鲁毛片免费| 人人爽人人草| 色噜噜噜噜| 成人毛片网| 天天草av| 天天干天天爽天天射| 中文字幕在线第一页| 床上做暧暧视频免费| 福利视频在线4| 色婷婷网| 一区二区三区av| 久久久精品国产sm调教网站| 国产AV无码专区亚洲AV毛片搜| 懂色AV一区在线播放| 国产日韩高清无码| 欧美一区二区影院| 国产99免费| 干老熟女| 久久久国产精品免费A片3D| 国精产品呦呦仙踪林| 国产精品户外野外| 麻豆午夜视频| 九九热线有精品视频86| 欧美中文字幕一区二区| 成人综合在线视频| 后入在线| 亚洲我射| 91高清在线| 少妇无码AV无码专区在线观看| 天天干夜夜操911| 欧美成人无码观看| 亚洲少妇p| 天天三级片| 国产免费无码一区二区| 不卡的aV在线观看| 精品国偷自产一区二区三区| 猫咪aV大香蕉| 日韩欧美一区二区三区视频| 亚洲无码人妻视频| 成人特级毛片| 亚洲精品爆乳毛片| 欧美成人精品A A A| 男人天堂2025| 男人的天堂色| 免费福利片| 伊人av电影| 国产又粗又长又黄| 成人三级在线| 亚洲射精视频| 日日操视频| 亚洲第十页| 午夜网| 国产免费又黄又爽又色| 亚洲电影成人| 久久电影一区| 亚洲自偷拍| 亚洲美女偷拍| 国产v精品| 成人精品三级| 亚洲精品三区一| 国产精品19乱码一区二区三区| 国产一区二区四区在线2021| 超碰91人人| 国产又粗又猛又大爽| 美女亚洲一区| 91人人妻人人澡人人爽人人狠| 最新久久久| 青青操久久| 亚洲乱 亚洲乱 亚洲| 99插插插| 午夜蜜桃视频| 久久久久久久麻豆| 无码人妻精品一区二区蜜桃视频 | 91精选国产| 日产AAAAA| 少妇与邻居做爰| 国产成人精品综合在线| 精品卡一卡二新区仙踪林| 成全在线播放| 大地影视资源中文官网| 99er久久国产精品在线| 久久这里只有精品2| 国家一级内射| 欧美日韩精品一区二区三区在线观看| 人妻丰满熟妇av无码区二区| 久久久999国产精品| 黄片在线视频免费观看| 9191视频| 麻豆三级| aaa亚洲精品| 日韩在线欧美在线| 久久精品视频8| 久久久毛片| 久久六月天| 影音先锋资源啪啪啪| 浪潮AV在线观看高清| 亚洲日韩乱码中文无码蜜桃臀网站| 大地资源高清在线观看| 亚洲精品久久久久久偷窥| 500部大龄熟女| 日产久久久| 啊啊啊免费| 日韩三级黄片| 女人被狂躁到高潮20次| 超碰福利在线| 韩国精品久久久| 精品国产91乱码一区二区三区| 久久这里只精品热在线99| 激情综合五月亚洲婷婷| 亚洲无线一线二线三W9| 国产亚洲精品久久精品6| 九九久久一区二区| 中文字幕人妻在线一区| 国产喷白浆一区二区三区| 国产91啪啪| 国产精品熟女视频| 精品久久久中文字幕| 八戒影院| 暖暖的在线观看日本社区| 国产suv精品一区| 欧美综合久久| 美女Av影院| 熟女一级片| 国产精品资源网| 国产丰满熟女一区二区| 五月丁香久久久| 国产 欧美 亚洲 中文字幕| 光棍天堂社区最新| 国产美女在线精品免费观看网址| 99久久毛片| 日日射日日操| 色男人天堂| 狠狠躁夜夜躁人人爽视频| 无码在线不卡| A片免费观看一区二区三区| 中文字幕久久熟女人妻AV免费 | 99精品在线| 91精品国产综合久久久蜜臀图片| www.热久久| 91国在线视频| 丁香美女社区| 久久热这里只有精品| 欧美日韩中文字幕在线| www.亚洲一区二区三区| 无码久久久| 九九国产| 暖暖视频在线观看视频播放| 国产欧美精品一区二区色综合| 一本大道久久久久精品嫩草| 日本大尺度在线观看| 特级毛片无码免费视频| 国产最新精品| 国产精品色情国产三级在| 国产男女猛烈无遮挡A片软件| 亚洲视频在线观看网站| 国产二区三区四区| 52色擼99热99RE超碰| 爆操黑丝美女| 国产亚洲精品久久久久久郑州| 天堂在线bt| 欧美成人免费视频| 久久久久久久亚洲| 96精品视频| www.色小姐.com| 亚洲AV成人精品日韩一区| 激情小说综合网| caopornx在线超碰免费| 欧美日韩xxxx| 欧美日韩激情一区二区| 亚洲AV无码国产精品文在线一区| 黄色一级片视频| 麻豆视传媒官方网站入口武汉| WWW丁香五月啪啪激情综合| 欧美色性爱| 国模在线视频| 伊人婷婷色| 麻豆视传媒短视频在线观看| 亚洲久悠悠色悠在线播放| 亚洲毛片网站| 日本成人A| www偷拍| 乳欲办公室HD| 最近的中文字幕大全免费| 亚洲a网站| 高清无码久久| 一区二区中文字幕| 青青青在线播放视频国产| 久久中国毛毛片爱久久| 日本精品久久久久久| 久久伊人av| 欧美人与动牲交A免费| 麻豆传煤官网APP入口在线网站| 成人区人妻精品一区二视频| 人人擦| 久久久久99精品| 家庭乱码伦小说区| 成人7777| 国产不卡在线视频| 日韩精品久久久久久免费| 国产中的精品AV一区二区| 国产乱╳╳╳╳性视频大全| 无码成人在线| 日韩手机在线观看| 天天草天天| 国产精品区二区三区日本| 狠狠干人人操| 人人插人人干| 日欧精品卡2卡3卡4卡| 天天插天天日天天干| av亚洲产国偷v产偷v自拍麻豆| 色婷婷18| 538prom精品视频我们不只是 | 国产熟人AV一二三区| 亚洲精品欧美精品中文字幕 | 亚洲一二三四视频| 久久AV无码精品人妻系列试探| 国产123区在线观看| 性爱视频中文字幕| 97人妻超碰| 激情色播| 一二三区免费| 日韩二区三区| 国产亲妺妺乱的性视频| 伊人AV影院| 一级内谢又粗又黄| 亚洲五月婷婷| 久久婷婷五月综合色丁香花| 日本欧美一区二区三区不卡视频| 日韩精品午夜| 暖暖直播在线观看免费| 伊人精品影院| 成人视频精品| 亚洲精品日韩综合观看成人91| 国产日韩欧美高清免费视频| 欧美又大又粗又长| 人妻精品久久久久中文字幕影院| 欧美极品护士VIDEOSVIDEO| 欧美性爱视频免费看| 亚洲精品一区二区无码日本蜜桃| 亚洲AV午夜精品一区二区三区| 日本午夜精品久久久无码| 少妇一级淫片| 西瓜影院| 免费看污又色又爽又黄的小说男男| 性感av在线| 6080影院| 性色蜜桃臀AV| 视频精品久久| 久久人人人| 精品无人区麻豆乱码1区2|