久久久勾缠精品夜色|99勾缠成人高清在线观看|一级做a爰片欧美一区|熟妇人素无码中文字幕|久久久勾缠精品欧美激情|欧美日韩一区精品在线|勾缠精品美女自在线观看免费|欧美另类极品videosbest视|日韩v欧美V另类蜜桃|麻豆久久五月综合勾缠

網(wǎng)站公告-NOTICE

新聞資訊

當(dāng)前位置:首頁(yè) / 新聞資訊

關(guān)于電纜橋架修復(fù)和維護(hù)的方法

電子工業(yè)是國(guó)民經(jīng)濟(jì)支柱工業(yè)之一,也是新式科學(xué)技術(shù)開(kāi)展工業(yè)。電纜的防護(hù)就會(huì)顯得特別重要,運(yùn)用濟(jì)南電纜橋架能夠起到電纜防塵防腐等損傷電纜運(yùn)用壽命的狀況呈現(xiàn)。下面整合了關(guān)于電纜橋架怎么修復(fù)和維護(hù)的方法,得當(dāng)?shù)木S護(hù)可以延長(zhǎng)電纜橋架的使用壽命。
The electronic industry is one of the pillar industries of the national economy, and it is also a new type of scientific and technological development industry. The protection of cables will be particularly important. The use of cable tray in Jinan can play a role in the situation of cable dust prevention, corrosion prevention and other damage to the service life of cables. The methods of repair and maintenance of cable tray are integrated below. Proper maintenance can extend the service life of cable tray.
電纜橋架修復(fù):
Repair of cable tray:
1.銹跡處理
1. Rust treatment
通常電纜橋架采用氯磺化底漆二道進(jìn)行兩部分除銹,表面除銹處理質(zhì)量直接影響防腐工程的壽命,現(xiàn)場(chǎng)除銹通常是砂輪機(jī)或者人工除銹,在表面處理之后,在4小時(shí)內(nèi)涂上底漆。如果處理不當(dāng)發(fā)現(xiàn)有新銹,必需進(jìn)行重新處理。
Generally, cable tray is subject to two parts of rust removal with two layers of chlorosulfonated primer. The quality of surface rust removal treatment directly affects the service life of the anti-corrosion project. The on-site rust removal is usually performed with a grinder or manually. After surface treatment, the primer is applied within 4 hours. If new rust is found due to improper handling, it must be re treated.
2.涂層處理
2. Coating treatment
涂層工藝分為刷涂、滾涂。刷涂或者滾涂時(shí)每層應(yīng)從橫交錯(cuò)反復(fù)進(jìn)行涂,直到均勻?yàn)橹梗荒艹霈F(xiàn)漏涂。
The coating process is divided into brush coating and roller coating. When brushing or rolling, each layer should be applied repeatedly in a horizontal and staggered manner until uniform, and there should be no leakage.
3.施工環(huán)境要求
3. Construction environment requirements
環(huán)境需要通風(fēng)良好,溫度好在13℃-30℃,不得低于5℃,相對(duì)濕度保持在80%以內(nèi)。不宜在強(qiáng)烈日光下施工。遇到雨、霧、強(qiáng)風(fēng)氣候不得在室外進(jìn)行施工。
The environment needs to be well ventilated, with a temperature of between 13 ℃ and 30 ℃, not less than 5 ℃, and a relative humidity of within 80%. Construction should not be carried out in strong sunlight. Construction shall not be carried out outdoors in rainy, foggy, or windy climates.
濟(jì)南電纜橋架
電纜橋架維護(hù):
Cable tray maintenance:
1.避免擺放在高溫潮濕地方。
1. Avoid placing in hot and humid areas.
2.避免與腐蝕性液體接觸。
2. Avoid contact with corrosive liquids.
3.可用電纜橋架專用的保養(yǎng)蠟進(jìn)行保養(yǎng)。
3. Special maintenance wax for cable tray can be used for maintenance.
4.定期清理電纜橋架表面的灰塵與銹跡。
4. Regularly clean the dust and rust on the surface of cable tray.
此外在運(yùn)輸、裝卸電纜橋架時(shí),電纜橋架架應(yīng)牢固地系在車輛上,以免碰撞和損壞電纜橋架。卸貨時(shí),電纜橋架架不得直接從車上推下,搬運(yùn)時(shí)注意避免碰撞;存放時(shí),必須分門別類堆放,不得敲擊。這些層應(yīng)該用軟物體分開(kāi)。
In addition, during the transportation, loading and unloading of cable tray, the cable tray frame shall be firmly tied to the vehicle to avoid collision and damage to cable tray. When unloading, the cable tray frame shall not be pushed down directly from the vehicle, and collision shall be avoided during handling; When storing, they must be stacked in different categories and must not be knocked. These layers should be separated by soft objects.
請(qǐng)勿在電纜橋架上放置重物,以免超重的電纜橋架架變形或損壞防腐層。在潮濕或腐蝕性環(huán)境中,應(yīng)采取相應(yīng)措施,如有損壞應(yīng)立即處理;鍍鋅電纜盤驗(yàn)收后應(yīng)放置在干凈干燥的地方,并用蓋板覆蓋,避免酸、堿等腐蝕性物質(zhì)。
Do not place heavy objects on the cable tray to avoid deformation or damage to the anti-corrosion coating of the overweight cable tray. In humid or corrosive environments, corresponding measures should be taken, and any damage should be dealt with immediately; After acceptance, the galvanized cable reel should be placed in a clean and dry place and covered with a cover plate to avoid corrosive substances such as acid and alkali.
更換橋架前,應(yīng)召開(kāi)會(huì)議,討論制定一套嚴(yán)格的措施和施工方案,并經(jīng)電機(jī)部門審查。審核結(jié)束后,準(zhǔn)備好各種工具和材料,分配人員,安排好每個(gè)人員的具體職責(zé)。開(kāi)工前,到施工現(xiàn)場(chǎng)進(jìn)行實(shí)地勘察,確定需要更換的橋架,制定表格,做好詳細(xì)記錄。更多相關(guān)內(nèi)容就來(lái)我們網(wǎng)站http://chenchen1688.com咨詢吧!
Before replacing the bridge, a meeting should be held to discuss and develop a strict set of safety measures and construction plans, which should be reviewed by the motor department. After the audit, prepare various tools and materials, assign personnel, and arrange the specific responsibilities of each person. Before starting work, conduct on-site investigation at the construction site to determine the bridge that needs to be replaced, develop a table, and make detailed records. For more related content, come to our website http://chenchen1688.com Consult!
上一篇:橋架的安裝使用到底要怎么確保其通電性能?
下一篇:電纜橋架安裝準(zhǔn)備工作和施工工藝等流程
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
五月婷婷丁香激情| 久久久久国产精品一区二区| 日韩亚洲欧美一区二区| 91视频美女| 国语自产拍在线观看hd| 大地资源中文在线观看官网第二页| 桃花社区在线观看视频播放| 色人阁26uuu| 婷婷国产亚洲精品网站| 国产AV麻豆MAG剧集| av手机在线看| 鲁死你资源站亚洲av一级aⅴ| 国产在线91视频| 日本人妻精品| 欧美亚洲第一区| 欧美三日本三级少妇三2023| 粉色app福引导| avi电影网站| 久久久久97高清毛片视频| 久久av在线| 亚洲一区二区人妻| 国产精品久久久久久久久动漫| 秋葵加油站APP下载地址入口| 欧美牲交A欧美牲交| 2017最新h无码动漫| 国产99久久久国产精品免费看| 国产Av自拍偷拍| av av在线| 中出中文字幕| MD传媒APP入口免费网址| 国产免费无遮挡| 斯利那加属于什么国家| 亚洲国产小视频| 亚洲不卡| 黄色香蕉视频网站| 又黄又刺激的视频| 亚洲AV无码精品成人影院在线观看| 可以免费看av的网站| 日韩你懂的| 成人午夜视频精品一区| 大地影院高清官网在线观看|